Online Permitting Now Active
All permit submittals will be made online through the Permit Portal.
You will submit the same application, fees, construction drawing, calculations and maps as always but DIGITALLY and through the PERMIT PORTAL. You will upload documents and be invoiced once the application and fees due are verified. You will be able to track the progress of your permit through the portal.
First you will need to create a Login account. Engineering firms should consider creating an account for the Firm rather than individuals.
For instructions on how to apply online, click here.
To the right are a set of links that detail the Erosion Control Permitting and Plan approval process along with other specifications, requirements and details. Wake County requires at minimum the use of these in approved plans
Plan Review Process |
Construction Sequence |
Stockpile Requirements |
Seeding Specifications |
Sediment Basin Design Criteria |
Wake County Basin Design Spreadsheet |
Basin Removal Sequence |
Stormwater Construction Sequence (under development) |