Wastewater Fees

Residential Onsite Wastewater (Septic Only)

Permit Type

Fee

New Development Individual On-Site Wastewater

 
  • Improvement Permit (limit to less than 3 acres per evaluation)

$200

  • Construction Authorization (includes Operation Permit) 

$200                

(Includes requested revisions to existing construction authorizations) 

      Total $400

Manufactured/Mobile Home Relocation (Construction Authorization Only)                

$200                  

Mobile Home Relocation Fee Inside Permitted Mobile Home Parks 

No Fee   

Manufactured/Mobile Home Relocation-Modifications needed/change in design flow                                   

 
  • Improvement Permit (limit to less than 3 acres per evaluation) 
$200
  • Construction Authorization (includes Operation Permit) 
$200
 

Total $400

Verifications for Change of Use or System Reuse (Existing Onsite Wastewater systems only. No change to flow or lot size)

$200

Renew Septic Permit (expired  after 5 years) 

 
  • CA renewal only 
$200
  • IP and CA Renewal 
$400

Design Review Fee for Residential Permits 

$110

Re-Inspection Fee (Penalty for unnecessary return trips on Lot Evaluations and Failed Installation Inspections)

$75

Field Consultation 

$100

Commercial Wastewater Permits (Designed/Engineered/Large Systems)

Permit Type

Fee

Domestic Strength Wastewater Systems (≤ 720 gallons/day design flow) (Excluding Industrial Process Wastewater) 

 
  • Improvement Permit 

$200               

  • Construction Authorization

$200

  • Design Review Fee

$110

 

Total $510

Domestic Strength Wastewater Systems (>720 and ≤ 3,000 gallons/day design flow) 

Industrial Process Wastewater (≤ 3,000gallons/day design flow) 

 
  • Improvement Permit
$200
  • Construction Authorization
$200 
  • Design Review Fee
$460
  Total  $860

Domestic Strength Wastewater Systems (> 3,000 gallons/day design flow)

Industrial Process Wastewater (> 3,000gallons/day design flow)

Connection is equivalent to 360 gallons/day design wastewater flow

Per Connection
  • Improvement Permit (per connection)
$200
  • Construction Authorization (per connection)
$200
  • Design Review Fee (Variable based on # of connections)
$110

LPP or Alternative Systems (O & M Inspections) 

(Type V and Type VI Systems – per connection) 

Connection =360 gallons per day design wastewater flow 

$19/conn. 

Septage Land Application Sites 

$400